Re: Deep Sea Oil Well Tech
Quote:
Originally Posted by dcarrb
Yeah, I'm sure you're right, but I was thinking what they tried was supposed to fit precisely over, or attach to, the "blowout preventer." I'm just trying to understand why a giant containment vessel, heavy enough for the sides to sink deeply into the sea bed, can't be lowered from a ship-borne crane and maneuvered into position with robotic submersibles. Seems so obvious, I have to be missing something.
dcb
|
Thats what the first attempt was... Remember that they are dealing with a depth of around 1 mile. That is the main problem. It would be like trying to thread a needle using 20' chopsticks.
Last edited by dbarnblatt; 05-31-2010 at 12:02 PM.
|